Vision:
- To establish as an outstanding wing of the Department for ensuring that proper investigation is conducted before designing the Water resources structures thereby improving the standards and minimizing the cost of the structures. And to ensure that every work shall be properly investigated and all relevant data collected and correlated before finalizing the design and estimate for the work.
- To minimize the Wrong choice of site or designs based on incorrect or insufficient data can result in considerable avoidable expenditure and delays
Mission:
- Empanelling of Contractors/Consultants for taking up Investigation works
- To guarantee that every work is properly investigated and all relevant data are collected and correlated before finalizing the design and estimate for the work. Wrong choice of site or designs based on incorrect or insufficient data can result in considerable avoidable expenditure and delays.
- To ensure that the financial implication of each proposal is looked into and the most economical one is finally recommended without sacrificing the technical feasibility.
- To ensure that the benchmarks and survey reference points shall be carefully selected and properly established so that there is no likelihood of these being missed when the work is taken up for execution and that, the benchmarks are connected to the nearest permanent Mean Sea Level (M. S. L.) Bench Mark.
- Vetting of investigation reports submitted by field officers and to scrutinize whether it is in accordance with the provisions contained in the relevant codes and practices
- Vetting of Prefeasibility/ Feasibility Report/DPR of Water resources schemes, submitted by subordinate offices before submission to Government